12V 5A switching power supply for led strip
Model | LH-DY-5 | LH-DY-12 | LH-DY-15 | LH-DY-24 |
DC output voltage | 5V | 12V | 15V | 24V |
Output voltage tolerance | ±2% | ±1% | ±1% | ±1% |
Rated output current | 24A | 10A | 8A | 5A |
Output current range | 0-24A | 0-10A | 0-8A | 0-5A |
Ripple and noise | 50mVp-p | 100mVp-p | 100mVp-p | 100mVp-p |
Inlet stability | ±0.5% | ±0.5% | ±0.3% | ±0.2% |
Load stability | ±1% | ±0.5% | ±0.3% | ±0.2% |
DC output power | 120W | 120W | 120W | 120W |
Efficiency | 79% | 84% | 85% | 85% |
Output voltage adjustment range | ±10% | ±10% | ±10% | ±10% |
AC input voltage range | 85~132VAC/170~265VAC/47~63VAC,120~370VDC |
Input current | 0.6A/115V 0.35A/230V |
AC impulse current | Cold-start current 15A/115V 30A/230V |
Leakage current | <0.75mA/240VAC |
Overload protection | 105%~150% Type,PULSING HICCUP SHUTDOWN,Reset,auto recovery |
Over-voltage protection | 115%~135% rated output power |
Temperature coefficient | ±0.03%°C(0~50°C) |
Setup rise hold up time | 800ms,50ms,20ms/115VAC 300ms,50ms,80ms/230VAC |
Vibration | 10~500Hz,2G 10min./1cycle,Period for 60min,Each axes |
Withstand voltage | I/P-O/P:2.5KVAC I/P-FG:2KVAC O/P-FG:0.5KVAC |
Isolation resistance | I/P-O/P I/P-FG O/P-FG:500VDC/100MΩ |
Working temperature and humidity | -10°C~+60°C,20~90%RH |
Store temperature and humidity | -20°C~+85°C,10~95%RH |
Overall dimension | 199*98*38mm / 30pcs per carton |
Weight | 0.6Kgs |
Safety standards | Desgin refer to UL1012,EN60950-1,EN61347-1,EN-61347-2 approved |
EMC standards | EN55015,EN55022,EN55024,EN61000 |
Longhua LED Products:
Certificates:
Equipments:
About Us:
Quality Control:
-High qulity material selection to meat European clients requirement ( By material department)
-Each skillful worker mainly responsible for a procedure of production ,all the workers need training strictly before working (By the leader of factory)
-Packing with the box of client's request,any bad boxes are not allowed, then packing with the standard export carton with polyfoam protection.
-During production inspection and final random inspection (By QC staffs)
-More than 48 hours aging test for all production (By QC staffs)
Package&Delivery:
Packaging Detail: Custom-made package(OEM) , Nuetral Package, White Boxs+Outer Package.
Lead Time: 3-20 working days for large order.
Delivery Detail: 7 days upon order deposit.
Shipping: